Army rebuilds fallen CWG bridge in four days
It took seven years and Rs. 5 crore for a company to build a Foot Over Bridge (FOB) near the Jawaharlal Nehru Stadium, which then collapsed. The Indian Army , which was called in to salvage the Delhi’s pride and build a temporary FOB, has done the same job in four days flat and at a fraction of the original cost.
The Indian Army is now applying finishing touches to a Bailey Bridge, after a desperate Commonwealth Games Organising Committee and the Delhi government called them in to erect the temporary structure. The Bailey bridge will be used by spectators to reach the stadium after parking their cars at Safdarjung Airport.
Over 700 combat engineers from The Madras Engineer Group, informally known as the Madras Sappers (a regiment of the Corps of Engineers of the Indian Army) began work on the bridge on Saturday afternoon. The Indian Army and the Delhi government had said that the bridge, which has three piers and have four spans spread over 250 feet, was expected to be delivered in five days.
Read Full Report at
http://news.rediff.com/report/2010/sep/28/cwg-army-rebuilds-fallen-bridge-in-4-days.htm
Welcome to Haindava Keralam! Register for Free or Login as a privileged HK member to enjoy auto-approval of your comments and to receive periodic updates.
Latest Articles from Bharath Focus
- Narendra Modi: The Architect of India’s Momentous Transformation
- Republic Day Tableaux & Regional Pride
- Tarun Vijay meets Governor Arif Khan on Adi Sankara birthplace
- SC-ST പോസ്റ്റ് മെട്രിക് സ്കോളർഷിപ്പിൽ 5 ഇരട്ടി വർദ്ധനവ്
- Treading the Middle-Path on Temple Management
- Taming the dragon-Part-3
- Taming the dragon- Part 2
- India- China trade wars on the cards? Well researched blog on Indian govt.’s proposed plan to tax 371 Chinese goods
- Before removing the idols, I should be removed; Two Kerala faces we should never forget
- The Unseen Unheard Victims of Article 35(A)
Responses