Aranmula airport project will cause havoc on ecological balance: Kerala State Biodiversity Board report
“Conversion of paddy fields and water bodies for the construction of the airport would lead to water scarcity as well as flooding in the neighbouring areas,” says the third report of th. e Legislative Committee on Environment.
“Of the 500 acres earmarked for the project, 400 acres are paddy field. The runway for the airport is being constructed over the Kozhithode canal, a tributary of the Pamba. Many hills in the neighbourhood will have to be razed for soil to reclaim the fields, a process that could lead to biodiversity loss and water shortage,†the report says.
The report submitted to the government says that conversion of a portion of the 3,500-acre paddy field would impact surrounding wetlands, disturb food chain, and accelerate depletion of fish resources as well as other flora and fauna in the Pamba river basin.
The study conducted by KSBB observed upstream migration of several species of fish from the river through canals to water-logged paddy fields. “Reclamation of wetlands would deprive the fish of their breeding grounds,” says the report.
The report stressed the need to identify and protect the breeding grounds of fish and release hatchlings into the canal. It also called for an environment monitoring mechanism involving panchayat-level Biodiversity Management Committees.
The board recommends a series of conservation programmes to ensure that the airport project did not impact on the biodiversity of the region. It has cautioned against filling up of canals in the project site. “A massive afforestation campaign that will create a green belt around the airport and hills that were razed for soil,” observes the report.
The importance of rainwater harvesting system has been highlighted, with the report warning promoters of the airport being responsible for the supply of drinking water in the parched areas in the vicinity. It called for a joint effort by the Department of Agriculture and panchayats in the neighbourhood of the project site to continue paddy farming in the remaining fields.
The Rs.3,000-crore project put forth by KGS Group has been facing stiff opposition from environment activists and villagers, affecting the ecological ibalance of the place, it will wipe of a glorious cultural heritage and displace an entire society. Detractors also question the need for a fifth airport in a small State like Kerala.
Welcome to Haindava Keralam! Register for Free or Login as a privileged HK member to enjoy auto-approval of your comments and to receive periodic updates.
Latest Articles from Kerala Focus
- തിരുവാഭരണ പാതയിൽ സ്ഫോടക വസ്തുക്കൾ കണ്ടെത്തിയത് അന്വേഷിക്കണം: കെ.സുരേന്ദ്രൻ
- A Day with Hrudaya & Bhagya, Daughters of Veerbalidani Renjith
- സഞ്ജിതിന്റെ ഭാര്യയുടെ ജീവന് ഭീഷണിയുണ്ട്: പോലീസ് സംരക്ഷണം നൽകണം: കുമ്മനം രാജശേഖരൻ
- Kerala’s Saga of Tackling Political Violence
- Tribute to Nandu Mahadeva ; Powerhouse of Positivity
- പാലക്കാടിന്റെ സ്വന്തം മെട്രോമാൻ
- കേന്ദ്രഏജൻസികളുടെ അന്വേഷണം സംസ്ഥാന സർക്കാർ തടസപ്പെടുത്താൻ ശ്രമിക്കുന്നു: കെ.സുരേന്ദ്രൻ
- Kerala nun exposes #ChurchRapes
- Swami Chidanandapuri on “Why Hindu Need a Vote Bank?”
- Forgotten Temples Of Malappuram – Part I (Nalambalam of Ramapuram)